Category: How to Estimate Excavation and Backfill

CSI MasterFormat 16 Divisions

MasterFormat Divisions MasterFormat was first released in 1975 and only had 16 Divisions until the new 50-Division MasterFormat 2004 was released in late 2004. Divisions that are not listed below are reserved for future use (including Division 49.) Division 00 – Procurement and Contracting Requirements Division 01 – General Requirements Division 02 – Existing Conditions […]

Excavation – Earthwork Quantity Takeoffs NYC

What is earthwork in excavation? Before the earthwork is started, the whole area where the work is to be done shall be cleared of grass, roots of trees, and other organic matter. Site preparation shall consist of clearing grubbing and removal of any and all inappropriate materials. A common method of classifying excavation is by type of excavated material: topsoil, […]